"THREE SISTERS" Description: One of three allegorical representations of civil law from 14th century Italy. A book of law, the globe or affairs of the world balanced against the hook of commerce. The sword of strength and crown of just rewards.Original painting by Trevor Goring in the private collection of Powers & Santola, LLP. |
THE “BLACK BOX” continue...
Airbag Module Data
For vehicles that correspond with the 02002888 cable, the following data is available from the airbag module for recorded deployment and near-deployment files:
Data Summary Table
- SIR warning lamp status (on/off)
- Driver’s belt switch circuit status (on/off)
- Passenger front airbag suppression switch circuit status (on/off)
- Ignition cycles at deployment/near-deployment
- Ignition cycles at investigation
- Time from algorithm enable to deployment command (msec)
- Time from near-deployment to deployment command (sec) (if within 5 seconds)
Post-Crash Graph: SDM Recorded Velocity Change
- Plots change in forward velocity (MPH) versus time for 300 msec after algorithm enable.
For vehicles that correspond with the 02002828 cable, the following data is available from the airbag module for recorded deployment and near-deployment files:[19]
Data Summary Table
- SIR warning lamp status (on/off)
- Driver’s belt switch circuit status (on/off)
- Passenger front airbag suppression switch circuit status (on/off)
- Ignition cycles at deployment/near-deployment
- Ignition cycles at investigation
- Time from algorithm enable to deployment command (msec)
- Time from near-deployment to deployment command (sec) (if within 5 seconds)
- Time from algorithm enable to pretensioner deployment command criteria met (msec)
Post-Crash Graph: SDM Recorded Velocity Change
- Plots change in forward velocity (MPH) versus time for 300 msec after algorithm enable.
For vehicles that correspond with the 02002829 cable, the following data is available from the airbag module for recorded deployment and near-deployment files:
Pre-Crash Graph
- Vehicle speed 5 seconds before algorithm enable (MPH)
- Engine speed 5 seconds before algorithm enable (RPM)
- Percent throttle 5 seconds before algorithm enable
- Brake switch circuit status 5 seconds before algorithm enable (on/off)
Data Summary Table
- SIR warning lamp status (on/off)
- Driver’s belt switch circuit status (buckled/unbuckled)
- Passenger front airbag suppression switch circuit status (on/off)
- Ignition cycles at deployment/near-deployment events (msec) (if within 5 seconds)
Post-Crash Graph: SDM Adjusted Algorithm Velocity Change[20]
- Plots change in forward velocity (MPH) versus time for 150 msec after algorithm enable
The following six pages contain a copy of a typical Vetronix report.






Back to Table of Contents
Next Page >>
|
|
 |
 |
 |